Murphys Creek Road Realignment

Projects

Location: Murphys Creek Rd and Postmans Ridge Rd, postmans Ridge

Value: $1.5m

Client: Department of Transport and Main Roads

Expertise: Road Construction

Contract Type: Schedule of Rates

Duration: Nov 20 – Jun 21

Description: 

Realignment of Murphys Creek Road to enable continual flow through Postmans Ridge after the construction of the Toowoomba Second Range Crossing closed adjoining roads.

Scope: 

Large Cut-fill to create desired superelevation. Usage of geo grid to enable 1:1 Batters before installation of Guard Rail. Various new driveway crossings and pipes had to be installed to accommodate changing overland flow  

 

Challenges: 

Many Various Services in close proximity to works areas

High Traffic Volumes and 24 hour Traffic Control Required