Murphys Creek Road Realignment
Projects
Location: Murphys Creek Rd and Postmans Ridge Rd, postmans Ridge
Value: $1.5m
Client: Department of Transport and Main Roads
Expertise: Road Construction
Contract Type: Schedule of Rates
Duration: Nov 20 – Jun 21
Description:
Realignment of Murphys Creek Road to enable continual flow through Postmans Ridge after the construction of the Toowoomba Second Range Crossing closed adjoining roads.
Scope:
Large Cut-fill to create desired superelevation. Usage of geo grid to enable 1:1 Batters before installation of Guard Rail. Various new driveway crossings and pipes had to be installed to accommodate changing overland flow
Challenges:
Many Various Services in close proximity to works areas
High Traffic Volumes and 24 hour Traffic Control Required